Roadwork is set to begin Monday to rebuild the highway (not just resurface) from Albion (the William Nobbe dealership) to Route 1 in Grayville. Crews will be doing extensive structural repair, drainage work, and replacing 3 culverts. Additionally, 2.5 foot safety shoulders will be added to the current 18 inch shoulder, widening the highway. The current estimation for work completion is 4 months depending on weather conditions throughout the work period.